Inactive
Notice ID:W912P821B0044
The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material within any combination of the following D...
The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material within any combination of the following Dredging Regions: Berwick Bay Harbor, Berwick Lock Forebay, Tidewater Point, 20 Grand Point, GIWW vicinity of Mile 99, Wax Lake Outlet, GIWW vicinity of Bayou Shaffer, Port Allen Lock Forebay, Three Rivers, Baton Rouge Harbor (Devil’s Swamp), Old River Lock Forebay, Old River Lock Tailbay, and Morgan City Docks East. Work may be required in other areas of the New Orleans District or the Red River in Vicksburg District.