Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,
W912P8-25-B-0025
This project involves the removal and disposal of dredged material from the Tiger Pass Bar Channel, along with utility identification. The work must be completed within 135 calendar days after the Notice to Proceed. The performance location is the area defined by the contract drawings for the Tiger Pass Bar Channel.