Section 219 Chesterton Interceptor Rehab

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912P627RA003

The US Army Corps of Engineers – Chicago District intends to issue a solicitation for the Section 219 Chesterton Interceptor Rehab in Chesterton, Indiana, involving relining approximately 3,217 linear feet of existing 48-inch trunk sewer with a 42-inch slipliner pipe, split into base and option work. The work includes specialized insertion pits, sewer cleaning, televising, proofing, sliplining, annulus grouting, lateral reinstatement, traffic maintenance, and temporary erosion and sediment control, with safety compliance under USACE EM 385-1-1. The project is located along 8th Street from 8th Street and Morgan Avenue to the wastewater treatment plant on League Lane in Chesterton, Indiana. This acquisition is a 100% Small Business Set-Aside under NAICS 237990, with an SBA size standard of $45.0 million and an estimated construction cost magnitude between $1,000,000.00 and $5,000,000.00. The solicitation package is planned for advertisement in November 2026 and will be downloadable via PIEE; contractors must register in SAM and PIEE, and the point of contact is Jim Parizek.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W072 ENDIST CHICAGO
  PSC   Y1NZ CONSTRUCTION OF OTHER UTILITIES


Data sourced from SAM.gov. View Official Posting »