Barkley Emergency Gate Machinery Inspection
The contractor must provide labor, materials, and equipment to clean, disassemble, inspect, and reassemble all lifting machinery for the Barkley Lock Emergency Lift Gate, including specific components like motors, gears, and brakes. Initial inspection reports with photos of deficiencies are required, along with touch-up painting for exterior surfaces. If a contract option is exercised, painting of respective components must follow completion of that option. After work is finished, as-built reports showing fits, backlashes, and contact patterns are needed, with PDF mark-ups acceptable and no CAD drawings required. The due date for quotes is extended to 17 July 2026 at 1400 Central Time, and the location for performance is the Barkley Lock Emergency Lift Gate.