Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912P523Q0028
The Contractor will furnish all equipment, materials, labor, and completed and approved design to fabricate a push boat and two (2) barges. The contractor will also deliver, outfit, pin, and launch bo...
The Contractor will furnish all equipment, materials, labor, and completed and approved design to fabricate a push boat and two (2) barges. The contractor will also deliver, outfit, pin, and launch boat and barges. All equipment shall be fully functional and operational. Training, manuals, and drawings shall be provided. Amendment 0001 and Amendment 0002 with associated attachments can be found at the PIEE link below under "Attachments". 28 August 2023 : See link below for visual of debris removal vessel use. http://www.youtube.com/watch?v=w5MBOjXBaVUw5MBOjXBaVU