Inactive
Notice ID:W912P519T0027
Amendment 0001 - 22 July 2019 The purpose of this amendment is to: 1. Extend the deadline for submission of quotes from 24 July 2019 to 31 July 2019 at 10:00 AM Central Time. 2. Answer questions recei...
Amendment 0001 - 22 July 2019 The purpose of this amendment is to: 1. Extend the deadline for submission of quotes from 24 July 2019 to 31 July 2019 at 10:00 AM Central Time. 2. Answer questions received during the question period. 3. Update CLINS and Price Schedule as a result of questions answered. 4. Update FAR 52.252-3: Alterations in Solicitation. All other terms and conditions remain the same. ************************************************************************ This is a TOTAL Small Business Set-aside to fabricate, deliver, and unload Stop-log slot filler, liners, and grating to Old Hickory and Cheatham Locks in accordance with the attached plans and specifications. The Contractor shall replace the wicket gate system at Old Hickory Lock with a stop-log system. The Base requirement is for the fabrication of two (2) stop-log slot liners and two (2) stop-log slot fillers and gratings for Old Hickory Lock. Option 1 requirement includes the fabrication of two (2) stop-log slot liners and two (2) stop-log slot fillers and gratings for Cheatham Lock.