Lorain Harbor West Breakwater Repair Phase II
This is a solicitation for the repair and rehabilitation of the Lorain Harbor West Breakwater in Lorain, Ohio. The project has a magnitude between $10,000,000 and $25,000,000 and is a 100% Small Business Set-Aside. The period of performance extends to include the 2028 construction season, with specific in-water work for the second year permitted to begin on 15 APRIL 2027. A virtual pre-bid meeting is scheduled for 20 JANUARY 2026, and a virtual public bid opening will be held on 12 FEBRUARY 2026. Key requirements include bonding, a current CMMC Level One status, and proper licensing for a Professional Surveyor.