Uninterruptible Power Supply (UPS) systems and maintenance
The Louisiana Army National Guard requires a contractor to replace and maintain Liebert and EATON UPS systems and install a 20KVA 480V input/480V output UPS with at least 10-minute battery capacity at Jackson Barracks under a performance work statement. The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control, and offerors must document manufacturer certification, authorized third-party status from EATON and Liebert, access to OEM parts, and a parts attainment process; priority goes to authorized third-party vendors obtaining parts directly from EATON and Liebert. Evaluation will be based on price and acceptable technical specification, PWS requirements, and past performance, with award to the lowest-priced acceptable offer, and options may be exercised on some CLINs. The solicitation was issued on 11 Sep 2026.