Inactive
Notice ID:W912NR-19-R-5002
The work consists of removing current floor coating and repainting the Hangar 5 floor as outlined in Section I (C) below and attached drawings, as well as removing current floor coating and repainting...
The work consists of removing current floor coating and repainting the Hangar 5 floor as outlined in Section I (C) below and attached drawings, as well as removing current floor coating and repainting Age(Bldg. 489), Hush House 1(Bldg. 189) and room 149(Hangar 5). Changes and/or modifications must have prior approval from the Contracting Officer. The contractor is responsible for any damages caused to government facilities. The Contractor is responsible for ensuring proper documentation and vehicle passes for personnel are received in time to avoid any delay in project start of performance. Proper documentation includes personnel attainment of contractor badges and appropriate advance notification to an Air Force Civil Engineer squadron representative for scheduling of escort support. Client will move equipment from areas of work. Period of performance: 45 days from receipt of Notice to Proceed. A formal solicitation will follow 10 April 2019.