Access Control System PR Army National Guard, USPFO Bldgs. (s) 540, 769 & 770
The Puerto Rico Army National Guard requires the supply, installation, and configuration of an access control system with eleven CAC reader units at facilities in Fort Buchanan and Camp Santiago, Puerto Rico. The period of performance for delivery, installation, and acceptance is 120 calendar days. This is a 100% small business set-aside under NAICS code 561621 with a $25 million size standard, and award will be made on a lowest-priced, technically acceptable basis. A mandatory site visit is scheduled for March 12, 2026, at both locations, requiring advance registration. Contractor employees must complete specific OPSEC training within 10 days of starting work.