Inactive
SBA Certified Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside (FAR 19.15)
Notice ID:W912LM-20-R-0002
Scope of Work: The contractor will be required to provide services to pump grey water from provided 300 gallon or 1000 gallon storage tanks and dispose of the grey water at a site provided on Camp Rip...
Scope of Work: The contractor will be required to provide services to pump grey water from provided 300 gallon or 1000 gallon storage tanks and dispose of the grey water at a site provided on Camp Ripley at no charge. The contractor may need to provide pumping of up to 1,000 gallons per site visit or until tank is empty and service up to 4 tanks per day as needed during peak season. Above ground storage tanks hold a maximum of1,550 gallons. The contractor must be able to manage and provide up to 200 portable chemical latrines to include moving and cleaning them, daily as needed during peak season (7 days a week, May - September). Must have adequate staff to support Camp Ripley Training Center and another location at Arden Hills Army Training Center customers. Servicing of portable latrines must includ cleaning and replacement of chemicals, hand sanitizer and toilet paper. The government will provice onsite dumping at Camp Ripley. The contractor must be able to read MGRS coordinates in order to place in correct location. Period of Performance: Performance based for one (1) base year plus four (4) one (1) year option periods. Dates 4/1/2020-3/31/2021 (Base), 4/1/2021-3/31/2022, 4/1/2022-3/31/2023, 4/1/2023-3/31/2024, 4/1/2024-3/31/2025