Inactive
Notice ID:W912LM-19-Q-9068
Relocatable Building Requirements 2 EA 20,000 square foot relocatable structures, 1 insulated/heated and 1 unheated. Structures must be completed within 90 days of award of bid. Heated facility Requir...
Relocatable Building Requirements 2 EA 20,000 square foot relocatable structures, 1 insulated/heated and 1 unheated. Structures must be completed within 90 days of award of bid. Heated facility Requirements: -Installation/erection of the structure on a concrete site -Insulated at R30 or better -Heated (natural gas heating source) to maintain a constant temperature of minimum 50 degrees -Able to withstand snow load and winds up to 80 MPH -LED Lighting for entire structure -2EA insulated overhead doors located on one end of the structure, minimum 14' X 14' -Personnel doors located at each end and centered on each side, with illuminated "EXIT" signs (4 personnel doors total) -2EA louvered openings on each end of structure to accommodate air circulation (4 openings total) -4EA 20-AMP outlets provided in a 24-ft span near each personnel door on the sides -Sprinklers to meet state of MN fire code -Architecture/mechanical and electrical designed all approved and stamped IAW Minnesota statute and Minnesota Board of AELSLAGID Unheated facility Requirements -Installation/erection of the structure on a concrete site -Able to withstand snow load and winds up to 80 MPH -LED Lighting for entire structure -2EA overhead doors located on one end of the structure, minimum 14' X 14' -Personnel doors located at each end and centered on each side, with illuminated "EXIT" signs (4 personnel doors total) -2EA louvered openings on each end of structure to accommodate air circulation (4 openings total) -Architecture/mechanical and electrical designed all approved and stamped IAW Minnesota statute and Minnesota Board of AELSLAGID This is sources sought. We requesting information on structure design, capabilities of the vendor, and past performance.