Concrete materials
The Directorate of Public Works at the Engineer Research and Development Center (ERDC) in Vicksburg, MS requires concrete materials for Building 2026 to reduce dust. All materials except the concrete must be delivered at one time within 14 calendar days of award. The concrete will be delivered in three separate, non-consecutive pourings totaling 181 cubic yards (approximately 39, 58, and 84 yards), scheduled by Tony King. These deliveries may occur in any order, with intervals of up to two weeks between them to allow for preparation. Performance location is Vicksburg, Mississippi.