Project is for construction of 165 acres PA-1A, for Chocolate Bayou Lower reach channel. The contract is for PA-1A that consists of constructing approximately 10,400 Liner Feet (LF) of perimeter dike ...
Project is for construction of 165 acres PA-1A, for Chocolate Bayou Lower reach channel. The contract is for PA-1A that consists of constructing approximately 10,400 Liner Feet (LF) of perimeter dike with borrowed clay from within the placement area and imported stone to confine the dredge material. Estimated clay to be borrowed is approximately 92,000 cubic yards. Estimated armor and filter stone to be imported are approximately 91,500 ton and 21,500 ton, respectively. Pre-solicitation Synopsis Attached.