Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912HY19B0036
The U.S. Army Corps of Engineers, Galveston District Office requires a contract for Buffalo Bayou Emergency Spillway Repair, Houston, Texas, Harris County, Texas Project Information: The project shall...
The U.S. Army Corps of Engineers, Galveston District Office requires a contract for Buffalo Bayou Emergency Spillway Repair, Houston, Texas, Harris County, Texas Project Information: The project shall include sealing and repairing joints and cracks in the roller compacted concrete spillway, constructing concrete piers, filling voids, and replacing damaged concrete lining. The Contractor will be required to clean the joints and cracks one up to one inch wide, and seal them with silicone sealant. Joints wider than 1 inch shall be grouted. Concrete piers will be used to stabilize the concrete pavement on the upstream side of Barker Dam North and Addicks Dam North spillways. Reinforced concrete will be constructed to replace damaged concrete lining location. Stabilize the upstream side slope concrete lining with the concrete piers before sealing or grouting the longitudinal cracks and joints at Barker Dam North spillway. The project will contain options which the Government may exercise at the time of award. The emergency spillways consist of earthen embankments capped with 8 inch thick roller compacted concrete on the downstream slope, the crown, and partially on the upstream slope. This concrete has no reinforcement, control joints or expansion joints. In the past, repairs have been performed to the concrete with reinforce concrete patches, and cracks and joints have been sealed with asphalt and silicon sealants. Option 1 Addicks Dam North Spillway -Stabilize the upstream side slope concrete lining with the concrete piers before sealing or grouting the longitudinal cracks and joints at Barker Dam North spillway. An additional 30 calendars days will be added to the completion time for this Option. Option 2 Concrete Piers at Barker Dam North Spillway - Where grout and sealant will be in contact, the grout is to be installed first and the silicon is to be applied after the grout has cured based on the manufacturer's recommendations. An additional 84 calendar days will be added to the completion time for this Option. Completion Time for the Base: 365 days. If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages in an amount $3,205.00 to the Government for each calendar day of delay until the work is completed or accepted. The Contractor will be required to provide the Performance and Payment Bonds within 5 calendar day after award. The contractor shall begin work within 10 calendar days after acknowledgement of the Notice to Proceed. The Solicitation will be issued as Firm Fixed Price. The magnitude of this project is S1,000,000 and $5,000, 000. The solicitation is advertised as 100% Small Business Set Aside. The North American Industrial Classification System (NAICS) Code applicable to this project is 237990. The Small Business Size Standard is $36.5 Million. The solicitation will be issued on or about 19 August 2019. Response date is 9 September 2019 @ 2:00 PM (CST) (All bids must be submitted electronically via www.FBO.gov). The estimated award date for this project is 27 September 2019. All offerors are encouraged to visit the Federal Business Opportunities website at https://www.fbo.gov to view and download the plans, specification and or any amendments for this procurement. Plans and specifications will not be available in paper format or on compact disc. To register as an "Interested Vendor", visit https://www.fbo.gov. Offerors must be registered with the Systems for Award Management (SAM), in order to receive a Government contract award. To register, the SAM Internet address is: https://www.sam.gov. The Contract Specialist for this solicitation will be Ms. Ronalda Burton, (409) 766-3801; E-mail: Ronalda.Burton@usace.army.mil.