DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Recent September 2026 updates include a posted preliminary RFI response report, site visit roster, and pre-proposal conference slides. The project will construct a 100,000-barrel cut-and-cover JP-8 storage tank with a reinforced-concrete pump house on top housing four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes a high-level valve, independent level alarms, automatic tank gauging hardware, product saver tank, and piping, valves, vaults, and appurtenances connecting to an existing filter separator building. Controls will tie into the existing filter building PLC/HMI and ATG reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. The steel tank will have a concrete outer wall and rolling cover, and a product recovery pump will return reclaimed fuel through receipt filtration to the bulk storage tanks.