DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
As of 19 October 2026, an updated RFI Response Report was posted to PIEE, following a preliminary RFI Response Report on 25 September 2026, a site visit roster on 14 September 2026, and pre-proposal conference slides on 10 September 2026. The project will construct a 100,000-barrel cut-and-cover JP-8 storage tank with a reinforced concrete pump house on top containing four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, automatic tank gauging hardware, piping, valves, vaults, and appurtenances connecting to an existing filter separator building, with controls tied into the existing filter building’s PLC, HMI, and ATG reporting module for all Eastside Fuel Facility tanks. A product saver tank is included, and the pump house will be site-adapted with a low-slope concrete roof and built-up roofing with doorway overhangs, while the tank will be steel with a concrete outer wall and rolling cover for access to tank-mounted equipment. A product recovery pump will return reclaimed fuel through receipt filtration to the bulk storage tanks.