FY26 Medical University of South Carolina (MUSC) Pump Upfit
The project involves upgrading the Medical University of South Carolina (MUSC) stormwater pump station, located on the Charleston Peninsula in Charleston, South Carolina. Work includes increasing pumping and discharge capacity, improving hydraulic configuration, elevating critical equipment above flood levels, upgrading electrical and controls, constructing a permanent bypass connection, and installing temporary pumps to maintain operations during construction. The estimated cost magnitude is between $5,000,000 and $10,000,000. The acquisition is unrestricted and falls under NAICS code 237110 for water and sewer line construction.