Tybee Island Shoreline Protection Project
The U.S. Army Corps of Engineers, Savannah District, plans an unrestricted full-and-open Invitation for Bid for the Tybee Island Shoreline Protection Project, resulting in a single firm-fixed-price contract. The construction magnitude is between $10,000,000 and $25,000,000, with work at Front Beach, Tybee Island, Georgia, using dredged material from an approved offshore borrow area about 5,000 feet from the south end and 11,000 feet from the center. The base bid involves placing about 820,000 cubic yards of berm fill along roughly 7,000 feet of baseline, with four option items adding about 673,000 cubic yards, plus environmental restrictions and beach tilling. Total construction duration is 90 days from Notice to Proceed, and the government anticipates issuing the IFB on or after November 6, 2026. Procurement will use FAR Part 14 sealed bidding, with the solicitation available electronically through SAM.gov and bids required via the PIEE Solicitation Module.
Tybee Island Shoreline Protection Project
The U.S. Army Corps of Engineers, Savannah District, is conducting market research to identify contractors capable of performing the Tybee Island Shoreline Protection Project on Tybee Island, Chatham County, Georgia. The project involves periodic beach renourishment along up to about 14,900 feet of Front Beach and South Tip Beach using up to approximately 1,500,000 cubic yards of beach-quality sand from an offshore borrow area roughly 8,000 to 20,000 feet away, including cutter suction dredging, hydraulic transport, placement, grading, environmental compliance, and tilling. The estimated construction magnitude is $10,000,000 to $25,000,000, and small-business dredging respondents must anticipate performing at least 40 percent of the dredged volume with qualifying equipment. Environmental restrictions limit beach placement to November 1, 2026 through April 30, 2027, with construction currently anticipated from late December 2026 to late March/early April 2027 within an anticipated 90-calendar-day construction period. Interested firms are asked to provide information on interest and availability, Tybee-specific dredge capability, relevant experience, bonding capacity, and industry feedback for the FY27 project.