Construct Air Traffic Control Tower and Base Ops at Robins AFB, GA
This 100% total small business set-aside involves constructing a new Air Traffic Control Tower and Base OPS at Robins Air Base, GA, with a construction magnitude between $25,000,000 and $40,000,000. Performance will occur over 900 calendar days after notice to proceed, and the project is fully designed with specifications and drawings provided at solicitation issuance. An organized site visit is scheduled for 7 July 2026 from 10:00-12:30, with badge request forms due by noon on 2 July 2026. The work includes reinforced concrete foundations, structural steel, brick veneer, and metal panel walls, along with all utilities, site improvements, and a backup generator. Bids must be submitted electronically via PIEE, and offerors must maintain active SAM registration.