Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912HN20B4004
Amendment 0014 - Inclusion of provision, 52.204-24 and clauses 52.204-25, 52.229-2 and 52.229-4. Sheets E-501, E-502, E-504 and E-604 with Revision 1 dated 29 July 2020 are hereby added to and made a ...
Amendment 0014 - Inclusion of provision, 52.204-24 and clauses 52.204-25, 52.229-2 and 52.229-4. Sheets E-501, E-502, E-504 and E-604 with Revision 1 dated 29 July 2020 are hereby added to and made a part of the Contract Drawings. Amendment includes the addition of a Casework sample drawing. This drawing is For Information Only Amendment 0013 - Extend the bid due date from 26 August 2020 to 30 October 2020 at 2:00 PM and the bid opening date from 26 August 2020 to 30 October 2020 at 3:00 PM. Amendent 0012-Extend the bid due date from August 11, 2020 to 26th August 2020 at 2:00 PM and the bid opening date from August 11, 2020 to 26th August 2020 at 3:00 PM. Replace Section 26 51 00 and added Sheet E-604 with Revision 1. Amendment 0011-Doesnt exist due to system issues. Amendment 0010-Doesnt exist due to system issues. Amendment 0009-Extend the bid due date from July 28, 2020 to August 11, 2020 at 2:00 PM and the bid opening date from July 28, 2020 to August 11, 2020 at 3:00 PM. Amendment 0008-To change the Bid Opening time from 2:00 p.m., 28th July 2020 to 3:00 p.m., 28th July 2020. The due date time of 2:00 p.m., 28th July 2020 for bids to be received has not changed. Amendment 0007-Extend the sealed bid due date from July 14, 2020 to July 28, 2002 at 2pm, add SAM registration info, update when ProjNet will close and added Sheet A-503 with revision 1 dated 10 July 2020. Amendment 0006-Doesnt exist due to system issues. Amendment 0005-Doesn't exist due to system issues. Amendment 0004-Extend the sealed bid due date from 30 June, 2020 to July 14, 2020 at 2pm. Amendment 0003-Doesnt exist due to system issues. Amendment 0002-To add bid bond information. Amendment 0001- To attach Site Visit sign in sheet and extend the bid opening by 2 weeks. Project objective is to renovate Rodriguez CDC, Building B-7033 at Ft Bragg. The renovation consists of demolition of existing grass surface. The new work consists of sediment and erosion control measures, and grading and modifications to the existing storm drain runoff as shown on the drawings. Also, the civil work includes the addition of concrete aprons, curbing, parking patching as indicated on the drawings. The Structural and architectural work consists of a repair to a 20,833 square foot, slab on grade building. Demolition to consist of removing some exterior doors and windows, most of the interior floor slab, all interior partitions, and all ceilings. The repair to the roof will include patching the existing roof deck from the removal of HVAC equipment, a new modified bituminous cold applied roof on the low slope portion, and a new metal roof on the sloped portion. The repair to the exterior to consist of the infill of door/windows installation of new doors/windows, and new exterior wall partitions. The repair to the interior of the building will include all new partitions per the new CDC layout, all new interior finishes, and new restrooms as indicated on the drawings. Other spaces included are a mechanical room, communications room, video room, storage rooms, and an electrical room.