Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912HN15R0621
THIS TASK ORDER IS FOR MATOC POOL W912HN-17-D-4000 (Bristol General Contractor), W912HN-17-D-4001 (Turner Strategic Technologies), W912HN-17-D-4003 (McFarland Atlantic) ONLY. Scope of Work. Contractor...
THIS TASK ORDER IS FOR MATOC POOL W912HN-17-D-4000 (Bristol General Contractor), W912HN-17-D-4001 (Turner Strategic Technologies), W912HN-17-D-4003 (McFarland Atlantic) ONLY. Scope of Work. Contractor shall furnish all labor, material, equipment, incidentals, supervision, and transportation for work necessary to repair sanitary sewer facility 1008, phase 3, Seymour Johnson, AFB, NC. This project scope is delineated in a full design plans and specifications package. This project provides for repairs of designated existing sanitary sewer lines and associated manholes throughout the entire installation. Repairs to sewer lines include point repairs, grouting, and liner installation. Repairs to manholes include relining, resetting frames, grade/elevation adjustments, and some abandonments.