Water Supply Storage System Bazum Village, Armenia (Design-Build Construction)
A design-build contract will construct a sustainable water supply and storage system for the Bazum community in northern Armenia, including water tanks, chlorination, water collection, and associated buildings. The government will choose between a river (Option 1) or groundwater well (Option 2) water source after completing a hydraulic study, which is part of the project requirement. A firm-fixed-price contract will be awarded in US dollars, with an estimated project magnitude of $350,000 to $800,000. A site visit is scheduled for 18 August 2026 at 11:00 local time at coordinates 40°54'6.89"N, 44°25'40.38"E, with offerors required to pre-register attendees via email at least 24 hours in advance.
Links (0)
Attachments (18)
Data sourced from SAM.gov.
View Official Posting »