Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912ES23B0004
Contractor will construct an island with granular fill from the channel maintenance dredging stockpile at Reads Landing and fine fill from access dredging and habitat dredging as needed. This island w...
Contractor will construct an island with granular fill from the channel maintenance dredging stockpile at Reads Landing and fine fill from access dredging and habitat dredging as needed. This island will increase the floodplain forest and fish overwintering areas. The Contractor will place riprap along the shore to protect the island. This rock will be obtained from Government approved, off-site sources. The Contractor will also locate, harvest, and plant willow cuttings; and establish turf as specified. This project is upstream of Lake Pepin, in Upper Pool 4 of the Mississippi River near Bay City, WI.