The Contractor shall provide all labor and material and perform all operations necessary to route out and replace all existing exterior flexible joint sealant material between building panels and arou...
The Contractor shall provide all labor and material and perform all operations necessary to route out and replace all existing exterior flexible joint sealant material between building panels and around all doors, windows and louvers on the exterior of the following: The Central Control Station, Lower Control Stand, and Well House at Lock and Dam 7 The Central Control Station, Lower Control Stand, and Comfort Station at Lock and Dam 8 The Central Control Station and Lower Control Station at Lock and Dam 10