Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912ES20Q0010
The Contractor shall provide all labor and material and perform all operations necessary to route out and replace all existing exterior flexible joint sealant material betweenbuilding panels and aroun...
The Contractor shall provide all labor and material and perform all operations necessary to route out and replace all existing exterior flexible joint sealant material betweenbuilding panels and around all doors, windows and louvers on the exterior of the Central Control Station at Lock and Dam 3, 4, 5 & 5A The Central Control Station, Lower Control Stand, and Pump House at Lock and Dam 3 The Central Control Station and Lower Control Stand at Lock and Dam 4 The Central Control Station, Lower Control Stand, Pump House, and Comfort Station at Lock and Dam 5 The Central Control Station, Lower Control Stand, Minnesota-Side Pump House, and Wisconsin-Side Pump House at Lock and Dam 5A.