Touchdown 08 Airfield Pavement Repair and Replacement
The U.S. Army Corps of Engineers anticipates soliciting a firm-fixed price, design-bid-build contract for comprehensive pavement repair and replacement at an undisclosed location east of Amman, Jordan. The primary work involves replacing 13,504 square meters of concrete and 13,354 square meters of asphalt with modified-heavy load concrete to extend the runway touchdown zone, including associated lighting and markings. A secondary scope requires design-after-award work for the foundational structure of Aircraft Arresting System Absorber Shelters. The anticipated period of performance is 540 calendar days after the notice to proceed. No budget amount is specified in this pre-solicitation notice.