Inactive
Notice ID:W912ER-22-R-0008
Amendment 0005-28 January 2022. Revision to Specifications and Drawings. Amendment 0004-29 December 2021. Proposal Due Date Extentened to 3 Febuary 2022. Amendment 0003- 21 December 2021. Endoresent B...
Amendment 0005-28 January 2022. Revision to Specifications and Drawings. Amendment 0004-29 December 2021. Proposal Due Date Extentened to 3 Febuary 2022. Amendment 0003- 21 December 2021. Endoresent B Re-upload in PDF and Word due to error message. Amendment 0003 - 20 December 2021. Drawings for Amendment 0003 added. Amendment 0003 -17 December 2021. Revised Specifications and Drawings added. Endorsement B:Calculation of Self Performed attachment added. Proposal due date remains unchanged. Amendment 0002- 18 November 2021: The proposal due date has been extended to 05 January 2022. ***** IMMEDIATE, TIME SENSITIVE ACTION REQUIRED ***** Amendment 001 - 25 October 2021 - FAR 52.236-27 has been revised. The following files have been added as a part of the amendment: W912ER22R0008 Amendment 0001 - Site Visit.pdf, SECNAV-5512_1.pdf, Site Visit Personnel Access.pdf, NSA Unescorted Personnel Access List Memorandum.pdf This is a requirement to construct an Electrical System Upgrade to support the growing mission within the Command, Control, Communications, Computers, Collaboration and Intelligence (C5I) Complex at the Naval Support Activity (NSA), in Bahrain. This is a D-B-B project and is referenced as P-974 Electrical System Upgrade. This requirement is to construct a more resilient medium-voltage distribution system. Increased resiliency provides a more secure system with fewer single points of failure, as well as, a more flexible system in which outages and fluctuations managed, lessening the impacts to critical facilities.