Belle Fountain Ditch Cleanout Phase 2
Belle Fountain Ditch Cleanout Phase 2 involves furnishing all plant, labor, and materials for channel cleanout of the Belle Fountain Ditch region, including Bypass of Steele and Main Ditch, plus incidental related work. The work is located from the confluence of New Franklin Ditch and Bypass of Steele, heading north through Bypass of Steele into Main Ditch, and ending 100 ft before the intersection of Main Ditch and County Rd. 442, approximately 2.5 miles south of Braggadocio, Missouri. It is advertised as a Service-Disabled Veteran Owned Small Business set-aside under NAICS 237990, Other Heavy and Civil Engineering Construction, with a Small Business Size Standard of $45M, using sealed bid procedures. Amendment 0001 has been posted.