The project consists of replacing 3-84" flap gates and calibrating the existing north sluice gate and replacing the limit switch to ensure it closes fully on the Cache River Culvert. A rock cofferdam ...
The project consists of replacing 3-84" flap gates and calibrating the existing north sluice gate and replacing the limit switch to ensure it closes fully on the Cache River Culvert. A rock cofferdam will be constructed on the landside of the levee in order to provide flood protection to the construction site during the project. A dewatering system will also be required to be installed for this project as described in the plans and specifications.