Inactive
Notice ID:W912EQ-19-M-0001
The project requirements is for Mississippi River channel dredging with a Hydraulic Pipeline Dustpan Dredge and Attendant Plant. The work consists of furnishing, delivering, and operating one fully op...
The project requirements is for Mississippi River channel dredging with a Hydraulic Pipeline Dustpan Dredge and Attendant Plant. The work consists of furnishing, delivering, and operating one fully operated hydraulic pipeline dustpan dredge and attendant plant for the removal and satisfactory disposal of shoal material. The primary dredging region will be any point on the Mississippi River between Cairo, Illinois (Mile 953.8 AHP) and New Orleans, LA. (Mile 106 AHP). Dredging may be required at secondary locations between Cubit's Gap (Mile 4.0 AHP) and Southwest Bar Channel (Mile 22.0 BHP); and tributaries of the Mississippi River. North American Industry Classification System (NACIS): 237990 Small Business Size Standard: $27.5M Magnitude of Work: Between $5,000,000.00 - $10,000,000.00 Acquisition Strategy: Firm Fixed Price, Unrestricted, Lowest Price Technically Acceptable (LPTA), RFP Contract Duration: Six (6) Months Estimate Start Date: 23 Jun 2019