Port Everglades USCG Reconfiguration Project
The Jacksonville District of the U.S. Army Corps of Engineers is conducting a sources-sought market survey for a potential FY2027 firm-fixed-price design-build contract to reconfigure U.S. Coast Guard Station Fort Lauderdale, with work also involving a provisional facility at Port Everglades Berth 28. The project includes abatement and demolition of existing facilities and pile/bulkhead systems, excavation and off-site disposal of contaminated soils, and construction of an approximately 36,000-gsf three-story multi-mission facility, a roughly 5,000-gsf boathouse, covered outdoor areas, and a boat basin with steel sheet-pile seawall and floating slips. The contractor would also provide a turnkey provisional station using six relocatable buildings, commercial moving services, utility connections, furnishings, maintenance during the provisional period, and final relocation, removal, and site restoration. The rough order of magnitude is between $100,000,000 and $250,000,000. Interested firms should show relevant design-build experience and capability, past-project examples, small-business classification, teaming structure if applicable, and bonding capacity in a response limited to five pages.