FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA
This project involves maintenance dredging of Fort Pierce Harbor with excavated material placed onto Fort Pierce Beach; due to extensive offshore hardbottom, offshore pipeline access is prohibited, and beach fill will be offloaded inside the South Jetty of Fort Pierce Inlet. A staging area and beach access are located at the end of Seaway Drive near the south jetty pumpout location. Work includes environmental and water quality monitoring, sea turtle trawl sweeping for hopper dredges only, screening, beach tilling, beach fill quality control, construction support, and vibration control/monitoring, divided into a base and two options. The target price range is $5,000,000 to $10,000,000. The contractor must commence work within 60 calendar days after Notice to Proceed, be off the beach by 30 May 2027, and complete the entire contract work by 30 June 2027, with the completion date based on an assumed Notice to Proceed by 10 December 2027.