FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA

Notice ID:W912EP26BA015

The project involves maintenance dredging of Fort Pierce Harbor, with excavated material placed on Fort Pierce Beach; because of extensive offshore hardbottom, offshore pipeline access is prohibited and beach fill will be offloaded inside the South Jetty of Fort Pierce Inlet. Staging and beach access are located at the end of Seaway Drive and near the south jetty pumpout location. Work also includes environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control and monitoring, divided into a base and two options. The target price range is between $5,000,000 and $10,000,000. The contractor must commence within 60 calendar days after Notice to Proceed, be off the beach by 30 May 2027, and complete all work by 30 June 2027, with completion based on an assumed NTP by 10 December 2027 and subject to extension for certain NTP delays.

FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA

Notice ID:W912EP26BA015

The project involves maintenance dredging of Fort Pierce Harbor, with excavated material placed onto Fort Pierce Beach; due to extensive offshore hardbottom, offshore pipeline access is prohibited and beach fill will be offloaded inside the South Jetty of Fort Pierce Inlet. Staging and beach access are located at the end of Seaway Drive and near the south jetty pumpout location, and work also includes environmental/water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control/monitoring. The work is divided into a base and two options, with a target price range between $5,000,000 and $10,000,000. The contractor must commence work within 60 calendar days after Notice to Proceed, be off the beach by May 30, 2027, and complete the entire contract work by June 30, 2027, assuming NTP is received by January 7, 2027.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W074 ENDIST JACKSNVLLE
  PSC   Z2KF REPAIR OR ALTERATION OF DREDGING FACILITIES


Data sourced from SAM.gov. View Official Posting »

FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA

Notice ID:W912EP26BA015

This project involves maintenance dredging of Fort Pierce Harbor in Florida, with dredged material placed onto Fort Pierce Beach; because of extensive offshore hardbottom, offshore pipeline access is prohibited, and beach fill will be offloaded inside the South Jetty of Fort Pierce Inlet, using staging and beach access at the end of Seaway Drive near the south jetty pumpout location. Work also includes environmental and water quality monitoring, sea turtle trawl sweeping for hopper dredges only, screening, beach tilling, beach fill quality control, construction support, and vibration control/monitoring, divided into a base and two options. The target price range is between $5,000,000 and $10,000,000. The contractor must commence work within 60 calendar days after receiving Notice to Proceed, be off the beach no later than May 30, 2027, and complete the entire contract work by June 30, 2027, assuming NTP by January 7, 2027; completion may be extended if NTP is delayed.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W074 ENDIST JACKSNVLLE
  PSC   Z2KF REPAIR OR ALTERATION OF DREDGING FACILITIES


Data sourced from SAM.gov. View Official Posting »

FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA

Notice ID:W912EP26BA015

The project involves maintenance dredging of Fort Pierce Harbor with excavated material placed onto Fort Pierce Beach, offloading inside the South Jetty of Fort Pierce Inlet because offshore pipeline access is prohibited due to extensive hardbottom offshore of the fill area. Work also includes environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control/monitoring, divided into a base and two options. The target price range is between $5,000,000 and $10,000,000. The contractor must commence work within 60 calendar days after receiving Notice to Proceed, be off the beach by May 30, 2027, and complete the entire contract work by June 30, 2027, assuming NTP by January 7, 2027, with completion extended if NTP is later for specified reasons. A staging area and beach access are located at the end of Seaway Drive and near the south jetty pumpout location.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W074 ENDIST JACKSNVLLE
  PSC   Z2KF REPAIR OR ALTERATION OF DREDGING FACILITIES


Data sourced from SAM.gov. View Official Posting »

FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA

Notice ID:W912EP26BA015

The project involves maintenance dredging of Fort Pierce Harbor with excavated material placed onto Fort Pierce Beach; because offshore pipeline access is prohibited due to extensive hardbottom, beach fill will be offloaded inside the South Jetty of Fort Pierce Inlet, with staging and beach access at the end of Seaway Drive near the south jetty pumpout location. Work also includes environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control and monitoring, divided into a base and two options. The target price range is between $5,000,000.00 and $10,000,000.00. The contractor must commence work within 60 calendar days after receiving the Notice to Proceed, be off the beach and complete the work ready for use by 30 May 2027, and complete the entire contract work by 30 June 2027, assuming the Notice to Proceed is received by 7 January 2027, with possible extension for delayed NTP except contractor-caused delays. Performance location is Fort Pierce Harbor, Fort Pierce Beach, and the South Jetty/Fort Pierce Inlet area.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W074 ENDIST JACKSNVLLE
  PSC   Z2KF REPAIR OR ALTERATION OF DREDGING FACILITIES


Data sourced from SAM.gov. View Official Posting »

FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA

Notice ID:W912EP26BA015

The project involves maintenance dredging of Fort Pierce Harbor, with excavated material placed onto Fort Pierce Beach; due to extensive offshore hardbottom, offshore pipeline access to the beach site is prohibited, so beach fill will be offloaded inside the South Jetty of Fort Pierce Inlet. A staging area and beach access are located at the end of Seaway Drive and near the south jetty pumpout location. Work includes environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control/monitoring, divided into a base and two options. The target price range is between $5,000,000.00 and $10,000,000.00. The contractor must commence work within 60 calendar days after receiving Notice to Proceed, be off the beach no later than May 30, 2027, and complete the entire contract work by June 30, 2027, based on an assumed NTP by January 7, 2027, with extensions if NTP is delayed.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W074 ENDIST JACKSNVLLE
  PSC   Z2KF REPAIR OR ALTERATION OF DREDGING FACILITIES


Data sourced from SAM.gov. View Official Posting »

FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA

Notice ID:W912EP26BA015

This contract covers maintenance dredging of Fort Pierce Harbor, Florida, with excavated material placed on Fort Pierce Beach, including environmental monitoring, sea turtle trawl sweeping, screening, beach tilling, and vibration control. It will be a single firm-fixed-price contract with a base and two options, requiring U.S. Coast Guard certified dredge equipment. The estimated magnitude of construction is between $5,000,000 and $10,000,000. Performance requires commencing work within 60 days of the Notice to Proceed (issued 60–90 days after award) with full completion by 30 May 2027 and clearing the beach by 30 June 2027. Work will be performed at Fort Pierce Harbor and the adjacent beach area in Florida.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W074 ENDIST JACKSNVLLE
  PSC   Z2KF REPAIR OR ALTERATION OF DREDGING FACILITIES


Data sourced from SAM.gov. View Official Posting »