Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912EP24B0004
A site visit will be held on 22 February 2024 at 10:00 AM, EST. Participants should contact Jen Tyler at 561-379-2854 or Jennifer.L.Tyler@usace.army.mil by Thursday, February 15, 2024 to coordinate ba...
A site visit will be held on 22 February 2024 at 10:00 AM, EST. Participants should contact Jen Tyler at 561-379-2854 or Jennifer.L.Tyler@usace.army.mil by Thursday, February 15, 2024 to coordinate base access. A Pre-Bid Conference will be held via teleconference on 26 February 2024 @ 10:00am EDT. The call-in number is: 1-844-800-2712, the Access Code is: 199 262 9798 and the link to be utilized is as follows: https://usace1.webex.com/meet/timothy.g.humphrey. It is requested that an email be sent to Guesley.Leger@usace.army.mil no later than 23 February 2024 at 3:00 PM, EST to confirm attendance by your organization. DESCRIPTION OF WORK: a. Project work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Additional Base work also includes bird monitoring and standby time. LOCATION REQUIRED DEPTH Range H to I and Upper Turning 45-foot UTB, 45-foot and 47-foot Basin (UTB) Range G to H and Explosive 44-foot and 47-foot Handling Basin (EHB) Range E to G and Magnetic 44-foot Silencing Facility (MSF) North Site Six North (SS-N) 39-foot Site Six South (SS-S) and Medium Auxiliary 45-foot Repair Dock (ARDM) Yoke Explosive Handling Wharves (EHW) 47-foot Refit Wharves 47-foot Small Boat Basin 24-foot Dry Dock Caisson Gate Sill and Dry Dock 46-foot Caisson Gate Mooring Facility b. Option A work consists of supplying additional field cut weir riser boards as requested by the Contracting Officer. c. Option B work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Option B work also includes mobilization and demobilization, bird monitoring and standby time. LOCATION REQUIRED DEPTH Site Six South (SS-S) and Medium Auxiliary 45-foot Repair Dock (ARDM) Yoke Site Six North (SS-N) 39-foot Explosive Handling Wharves (EHW) 47-foot Refit Wharves 47-foot Dry Dock Caisson Gate Sill and Dry Dock 46-foot Caisson Gate Mooring Facility Option C work consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work. The project will have an estimated period of performance of 300 calendar days after receipt of the Notice to Proceed (NTP). The stated time is inclusive of 60 calendar days to commence work and will be divided into base work and three options as follows: Base (including commencement and demobilization): 235 calendar days. Option A: 5 calendar days. Option B: 30 calendar days. Option C: 30 calendar days. The Invitation for Bid (IFB) will be issued on or about 8 February 2024 and bids will be due on or about 12 March 2024. NAICS Code 237990, Other Heavy and Civil Engineering Construction, size standard $45.0 million. Magnitude of construction is between $10,000,000.00 and $25,000,000.00. ** Naval Submarine Base Kings Bay security requirements require a great deal of time and effort to satisfy prior to attaining access to the work site. Detailed instructions for satisfying Naval Submarine Base Kings Bay security requirements will be included in the solicitation.