Starved Rock Lock and Dam Boiler Replacement
The contractor must provide a proposal for all equipment, materials, and labor to replace an existing steam boiler with a new Cleaver Brooks M5 steam boiler. The scope also includes installing a new Cleaver Brooks condensate return boiler feed system and upgrading the water filtration system. Performance will be at Starved Rock Lock and Dam. The U.S. Army Corps of Engineers will provide transportation and crane support to move the new boiler from land to the boiler house doorway.