Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912EK22R0006
This project includes, but is not limited to: Tree clearing and grubbing for site access; installation of bedding stone and rip rap for the right descending bank the outlet channel and around into the...
This project includes, but is not limited to: Tree clearing and grubbing for site access; installation of bedding stone and rip rap for the right descending bank the outlet channel and around into the uncontrolled spillway; bedding stone and rip rap placement of the main toe of the dam; replenishment of the access road along the main toe of the dam; bedding stone and rip rap placement along the eastern shoreline of the reservoir, bedding stone and rip rap placement along the western shore of the reservoir; installation of haul road access for material delivery and placement; site restoration. The contract base consists of work along the right descending bank of the outlet channel and the main toe of the dam. Option A will consist of shoreline stabilization along the eastern shoreline of the reservoir. Option B will consist of shoreline stabilization along the western shoreline of the reservoir.