Heise Roberts Levee Rehab
W912EF26RSS029
This project involves repairing four erosion damage sites along the Heise-Roberts levee system. The work includes excavating and armoring the levee with riprap revetment to protect the toe and slope from future flood events. The sites are located on the right and left bank levee systems near Lorenzo Bridge and Roberts Bridge. The total length of repairs spans approximately 2,100 linear feet across all four sites. No budget amounts or submission timelines are specified in the description.