Inactive
SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
Notice ID:W912EF-19-Q-0031
The RFQ (solicitation) closing date has been extended from 3 June 2019 to not later than 2 p.m. PDT, 7 June 2019. ****SOLICITATION W912EF-19-Q-0031 IS LINKED TO PRESOLICITATION SYNOPSIS W912EF19Q0031*...
The RFQ (solicitation) closing date has been extended from 3 June 2019 to not later than 2 p.m. PDT, 7 June 2019. ****SOLICITATION W912EF-19-Q-0031 IS LINKED TO PRESOLICITATION SYNOPSIS W912EF19Q0031**** THIS PROCUREMENT HAS BEEN SET-ASIDE FOR WOMEN-OWNED SMALL BUSINESSES, IN ACCORDANCE WITH FAR 19.1503 AND 19.1504 PROJECT SUMMARY: Construction project entitled: Mill Creek Project Diversion Dam Grouted Rip Rap Scour Repair. The work is located at the Mill Creek Project in Walla Walla, Washington. This will be a firm-fixed-price Construction contract. Construction is estimated to be between $100,000 and $250,000. Payment bonds are required. The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction and the associated small business size standard is $36.5M. Solicitation is open to women-owned small business concerns. WORK SCOPE SUMMARY: The Corps of Engineers, Walla Walla District, proposes to repair a section of riprap that has eroded in the Mill Creek channel just downstream of the Mill Creek Diversion Dam (across from Rooks Park. A scour hole has developed in this area. The Contractor will be required to fill the scour hole with approximately 200 TON of placed, keyed-in, rip rap and other well graded stone that is Contractor provided. Although flows are expected to be low during the Construction period, the Contractor will need to divert water away from the construction area and may need to pump some water out of the hole to complete the work. REFER TO THE SOLICITATION AND ASSOCIATED PACKAGES FOR FUTHER DETAILS INCLUDING BIDDER INQUIRY KEY.