Pre-Demolition Survey of Various Buildings, Marine Corps Air Station, Yuma, Arizona
This opportunity requires a contractor to plan and complete environmental sampling of excess facilities at a specified installation to identify Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). The contractor must also perform a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint on painted components. No specific budget amount or performance location is mentioned in the description. No non-bid or submission timelines are provided. The work focuses solely on environmental assessment and waste characterization for the listed structures.
Links (0)
Attachments (14)
Data sourced from SAM.gov.
View Official Posting »