PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY WALLOPS, VA
This contract requires environmental sampling of installation facilities to identify ACM, ORM, RCRA 8 metals, lead-based paint, and PCBs-in-paint. The contractor must quantify contamination and recommend safe removal and disposal methods, following all federal, state, and local regulations. Laboratory analysis must be completed within specified workdays after field sampling, and a final Pre-Demolition Assessment Report is due within a set number of workdays after receiving sample results. The contractor must access all facility areas, including exteriors, roofs, and basements, and report any inaccessible spaces. Performance location is at the installation, but no budget amount or non-bid timeline is specified.