Inactive
Notice ID:W912DY18RUEX5
1. Is your business currently a utility provider to Red River Army Depot, TX? 2. Is your business currently authorized by the State of Texas to provide a utility service to the Red River Army Depot, T...
1. Is your business currently a utility provider to Red River Army Depot, TX? 2. Is your business currently authorized by the State of Texas to provide a utility service to the Red River Army Depot, TX? 3. What is the name and address of your business? 4. Identify a responsible point of contact who can be contacted regarding your response, their phone number, and email address. 5. What is your company's CAGE code and DUNS number. 6. Is your firm a large business, small business, a certified 8(a) small business, certified HUBZone business and/or Service Disabled veteran owned concern? List all that apply. 7. Provide your company's project annual and maximum financing capability over a 10 year period in dollars that could be utilized for this contract for a project taking approximately 9-16 months to develop and award, plus an additional 12-18 months to complete construction. Assume no advance payment or financial assistance is available from the Government prior to or during the construction phase. 8. Provide no more than three (3) examples of financed energy conservation projects for which you were the prime contractor, a joint venture partner, or a first-tier subcontractor responsible for developing, financing, and/or managing the design, construction and/or post construction effort. Identify the scope of your contractual responsibilities, location, client, and size of the project in terms of construction cost and total financed amount. 9. Identify the financier and the amount financed (if any) for the above listed project(s). Provide financing source reference(s) including points of contact for telephonic confirmation of the dollar amount claimed for project financing capability. 10. Does your company have the capability to identify and obtain all permits required by Federal, state, local and installation agencies, including the capability of complying with environmental laws and regulations? 11. Does your company have the ability to work in the Red River Army Depot, TX area? 12. Does your company have experience or has partnered with a firm, in performing investment grade feasibility studies, economic analysis, such as Life Cycle Cost, Risk, and Return on Investment (ROI), which may be required in order to determine/demonstrate the financial viability of a proposed project? 13. Does your company have experience coordinating rebates, other incentives, and any potential interconnect/transmission discussions/agreements that may be necessary as part of a proposed project? 14. Is your company capable and qualified to search out energy and ancillary cost savings potentials in the Red River Army Depot, TX area? 15. Is your company capable of developing procedures, courses of action, steps, repairs, or changes in equipment which result in lower energy costs? 16. Is your company qualified and capable of providing work plans/designs? 17. Does your company have the capability to perform the construction efforts to include site security (fencing, lighting, and/or guard service) if required by the project? 18. Is your company capable of and qualified to provide maintenance and repair services for any energy related equipment including computer software systems? 19. Is your company capable of providing yearly equipment inspections to assure the equipment is being operated properly and maintenance is being performed? 20. Does your company have the capability to provide all personnel including dedicated project management, tools, equipment, transportation, materials, and supervision needed to safely and efficiently perform a UESC project? 21. Does your company have the capability to implement, maintain, and control a system for identification, preparation, reproduction, distribution, and maintenance of all documentation needed for its management of a UESC contract? 22. Does your company have the capability to provide and maintain an effective quality control program? 23. Does your company have the capability to provide, maintain, and execute an approved site safety and health plan? 24. Does your company have the capability to provide metering, monitoring, measuring, or testing equipment to verify savings? 25. Does your company have the capability to coordinate all work from all trades including subcontractors and suppliers for a UESC project? 26. Does your company have a GSA Areawide contract for UESC Energy Management Services? If so, what is the GSA contract #?