Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912DW25R0002
General work will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles...
General work will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle. The definitive removal / demolition work items for each building will require: Hazardous material / debris abatement and removal mostly within the crawl space Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc, Removal at ~ 90% removal of building mechanical – electrical systems Removal of the existing roof EPDM system (but not the roof framing structure) The definitive repair / new work items for each building will require: New exterior envelope New building mechanical – electrical systems New roof TPO system Other considerations for site work coordination New utility connections (mostly by other entities) Shared construction boundaries with adjacent current and future projects