United States Coast Guard (CG) Waterfront Optimization at the Coast Guard Yard, Curtis Bay, Maryland
W912DR26RA043
The U.S. Army Corps of Engineers seeks the design and construction of waterfront optimization at the Coast Guard Yard in Curtis Bay, Maryland. The project is critically necessary to prepare the yard for the arrival, maintenance, and repair of new cutter classes anticipated in 2030, requiring greater water depths and updated infrastructure. The work will be performed using a Firm-Fixed-Price contract and a two-phase Design-Build to Budget methodology. The planned construction period is 1,005 calendar days.