The Contractor will be responsible for making fiberglass repairs on Dalecarlia Caustic Soda Tank #3 and McMillan Caustic Soda Tank #12. Repair services for Dalecarlia Caustic Soda Tank #3 include reli...
The Contractor will be responsible for making fiberglass repairs on Dalecarlia Caustic Soda Tank #3 and McMillan Caustic Soda Tank #12. Repair services for Dalecarlia Caustic Soda Tank #3 include relining the tank floor and up the walls four (4) feet, adding layers to build up the knuckle all the way around the tank, relining the top manway flange, and repairing an area approximately twelve (12) inches by twelve (12) inches at approximately eight (8) foot level. Repair services for McMillan Caustic Soda Tank #12 include relining the tank floor and up the walls four (4) feet and adding layers to build up the knuckle all the way around the tank.