Debris Boom Supply and Install at Harry S. Truman Lake Project
The solicitation has been amended to revise the Purchase Description and CLIN structure, provide a ProjNet Plan Room key for bathymetry survey access, and post Contractor Questions Answered Part 2 and the contractor Q&A. The project requires a complete debris boom system at Harry S. Truman Dam to intercept floating debris upstream of the spillway and protect the tainter gates, while also serving as a visual barrier for boaters. The contractor must furnish all labor, materials, equipment, engineering, fabrication, delivery, and optional installation for an approximately 2,000-foot boom designed for site-specific hydraulic, wind, wave, debris, and impact loading. Design requirements include an 800-foot by 3-foot debris field, a minimum safety factor of 2.0, resistance to a direct head-on impact from an 18-inch-diameter, 100-foot-long log at maximum design water velocity, and 50 mph wind and 5-foot wave conditions. An organized site visit is scheduled for Friday, 9 October 2026 at 11am; the acquisition is full and open/unrestricted and is not set aside for small business.