Inactive
Notice ID:W912DQ23R4045
The scope of this D-B-B contract is to construct a new secondary access control point, new gatehouse, guard booths, inspection canopy and shelter, barrier wall, roadways, parking, lighting, traffic co...
The scope of this D-B-B contract is to construct a new secondary access control point, new gatehouse, guard booths, inspection canopy and shelter, barrier wall, roadways, parking, lighting, traffic control signals, active and passive vehicle barriers, information systems, fire protection and alarmy systems, Intrusion Detection Systems (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection and other structures as required by the standard design for a secondary ACP. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs, and gutters, storm drainage, information systems, landscaping and signage.