Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912DQ23B1039
The contractor shall remove navigation obstructions on the Missouri River to include the remaining foundation of old bridge piers, tributary debris, and rock outcropping. The obstruction areas are bet...
The contractor shall remove navigation obstructions on the Missouri River to include the remaining foundation of old bridge piers, tributary debris, and rock outcropping. The obstruction areas are betw een RM 397 to RM 365. The general scope of the work includes, but is not limited to: dismantling, demolition, removal, and disposal of navigation obstructions. Work consists of mobilization to the obstruction areas w ith appropriate removal equipment and the low ering of obstructions to the elevations specified or as directed by the Contracting Officer. All work to be performed will be completed by floating plant as no land access will be available. Mechanical methods will be used for removal of the obstructions. Contractor shall be required to be in full compliance with state and federal Clean Water Act Guidelines (Sections 404(b)(1) and 401 water quality permits). Excavation of rock outcropping shall not occur between 01 April through the following 30 June to avoid impact on the spawning season of federally protected pallid sturgeon. Amendment 0001 posted. See attachment for details. Amendment 0002 Posted. See attachment for Details. Questions and Answers from PROJNET also posted in attachments. Amendment 0003 posted. See attachment for details. Abstract of Offers posted. See attachment for details.