Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912DQ21R4008
Construction of Rubble Pile Material: This project consists of constructing materials constisting of 15 pre-cast concrete slabs, 30 concrete blocks, 10 concrete culverts, 10 concrete box culverts, and...
Construction of Rubble Pile Material: This project consists of constructing materials constisting of 15 pre-cast concrete slabs, 30 concrete blocks, 10 concrete culverts, 10 concrete box culverts, and providing 10 steel I-Beams. The contractor is responsible for delivering the items to a specified location at TA 235 on Fort Leonard Wood, Missouri. Complete details are contained in the attached Combined Synopsis/Solicitation document.