Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912DQ20Q6166
The general scope of this project is for the Contractor to perform the following on-site activities. The Contractor must supply all personnel required for a safe lift, including rigger and signaler. T...
The general scope of this project is for the Contractor to perform the following on-site activities. The Contractor must supply all personnel required for a safe lift, including rigger and signaler. The Contractor is responsible for submitting a lift plan for review a minimum of (7) business days prior to the scheduled lift. The Contractor must submit the specifications of the intended cranes to be used, no later than (7) days after award, so that a bridge load rating may be performed by USACE.