Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W912D0-19-Q-0012
***THE ENTIRETY OF THE PROJECT IS TO BE COMPLETED IN INTERIOR ALASKA*** The U.S. Army Garrison at Fort Wainwright has a requirement replace non-compliant floor tile installation, correct grounding in ...
***THE ENTIRETY OF THE PROJECT IS TO BE COMPLETED IN INTERIOR ALASKA*** The U.S. Army Garrison at Fort Wainwright has a requirement replace non-compliant floor tile installation, correct grounding in room 109 and install transition strip in 109 and break room on the west side. The Contractor shall provide all labor, materials, transportation, and storage as required to perform all work in accordance with specifications, commercial practices and industry standards. See statement of work (SOW) and attachments for further information. A site visit will be conducted on 16 September 2019, 1:00 PM Alaska Standard Time (AKST) at BLDG 3015, Department of Public Works (DPW), Facilities Management Conference Room, Fort Wainwright, Alaska. Failure to attend the site visit listed in FAR Clause 52.236-27 in order identify obvious site conditions does not constitute a valid claim for differing or unforeseen site conditions. Any questions must be submitted by e-mail to the point of contact below no later than 18 September 2019 by 10:00 AM AKST. All questions will be responded to through FedBizOpps.gov (FBO) only. The magnitude of this project is under $25,000. Quotes must be received electronically at heather.e.mcbride3.civ@mail.mil and john.r.quarles.civ@mail.mil. No other method of quote submission will be accepted. Adobe (.pdf) and Microsoft (.doc) are acceptable formats for submitting Quotes. The electronic file must be under 8MB total to ensure it can be received by e-mail. If you are having any issues submitting your quotes, please contact Heather McBride and John Quarles as soon as possible. The Government reserves the right to cancel this solicitation. Any questions shall be sent to the point of contact listed above.