FS BLDG T112 8 SIPR DROP INSTALLATION
The Army seeks a firm-fixed-price contractor to provide personnel, management, tools, equipment, parts/materials, transportation, and other services to install eight SIPR connections (four user drop locations) in Building T112 at Fort Shafter, Hawaii, with labeling per NEC and installation compliant with TIA/EIA standards. A SECRET clearance is required, and a site visit is scheduled for 19 November 2026 at 1330 at Fort Shafter Building T112, with Kyle Mishima as POC. The acquisition is a 100% small-business set-aside under NAICS 541519, with an estimated value of less than $350,000 and award based on the lowest-priced technically acceptable proposal. The period of performance is 1 January 2027 through 30 April 2027. Offerors must price equipment and installation as separate CLINs, including all taxes and fees.